Construction Value $4.0M
This Town of Cambridge project was completed in late 2016 and involved the replacement of the hospitality facility on the Wembley Golf Course site. The new double storey facility includes three large function spaces, restaurant, bar, large commercial kitchen, bridal room, cool rooms, commercial tenancies, toilets and store rooms. Total floor area is approximately 1,000m2 with a construction budget of $4.0M.
To reduce the initial capital cost and the ongoing running cost, in-direct evaporative coolers were used to supply outside air to the ducted air conditioning units that serve the function spaces. The required size of the function room air conditioning units was reduced due to the reduction in load of the outside air coming from the in-direct evaporative coolers, while a modulating outside air volume based on the carbon dioxide level in the spaces provides a reduction in the on-going running costs.